DRC

DRC Hydro projects

  • Two operational plants of 29 MW and 43 MW design capacity
  • Full refurbishment and rehabilitation required
  • Long-term BOT arrangement
  • Revenue collection via prepaid meter network
  • Initial works expected to commence December 2017

DRC Solar

  • 15 MW solar plant
  • Electricity will be sold into the SNEL grid
  • Revenue collection via prepaid meter network
  • Long-term BOT arrangement
  • Initial works expected to commence January 2018
  • 6-month construction period

DRC Hybrid Plant 8 MW

  • 8 MW hybrid solar-diesel plant
  • Electricity will be sold into the SNEL grid
  • Revenue collection via prepaid meter network
  • Memorandum of agreement regarding 20-year power purchase agreement signed July 2017
  • Initial work expected to commence December 2017
  • 4-month construction period

DRC Hybrid Plant 2.5 MW

  • 2.5 MW hybrid solar-diesel plant
  • Fully operational
  • Electricity is sold into the SNEL grid
  • Revenue collection via prepaid meter network
  • 20-year power purchase agreement signed 2016
  • Additional solar capacity and storage solutions being finalised